Gravel Calculator

Box volume for crushed stone or gravel. Cubic yards divide cubic feet by 27. Optional tons use a density in lb/ft³ you type. This is coverage, not a concrete mix design.

Rated 4.7 out of 5 based on 394 reviews

Results

How to estimate gravel coverage

  1. Enter length, width, and depth for the area you will cover.
  2. Pick units. Depth is often inches of stone on a driveway or path.
  3. Enter waste from 0 to 50 percent for compaction and extra.
  4. Optional: type density in pounds per cubic foot to see tons. Confirm with a quarry. Estimate only.

Crushed stone volume

Rectangular coverage, not concrete mix

VolumeL × W × D with waste
Cubic yard27 cubic feet
Tonsft³ × density (lb/ft³) / 2000
DensityOptional. You type lb/ft³.
Not computedGradation, base course design, or psi
AdviceEstimate only. Not a structural design.

How gravel volume and tons are computed

Edges convert to feet. Volume is the product times (1 + waste/100). Cubic yards divide by 27. If density is set, tons are cubic feet times lb/ft³ divided by 2000.

Crushed stone versus concrete

This page covers loose stone. It does not batch cement, sand, and aggregate into a mix. Concrete volume is the concrete calculator. Organic cover is mulch.

Estimate only

Compaction, moisture, and stone size change how far a load goes. A supplier ticket wins. Area without depth is square footage. This is not code approval.

Use cases

A driveway lift, a French drain trench approximated as a box, or a patio base. Irregular beds need extra rectangles you add yourself.

Limits

Length, width, and depth must be greater than 0. Waste stays from 0 to 50. Blank density skips tons. CZNull does not receive the numbers.

Gravel calculator questions

Does this page upload my numbers?
No. The formula runs in the page you opened. CZNull does not receive the values.
Is this a concrete mix design?
No. It is crushed stone coverage from a box volume.
How do tons appear?
Type a density in lb/ft³. Tons = cubic feet × density / 2000.
What waste percent should I use?
A common start is 10 percent. Compaction and odd shapes can need more. Ask the yard.
Is this structural design?
No. It is an estimate. Confirm materials with a supplier.
Can I treat the result as official?
No. Delivered stone varies. Use the page to check the arithmetic.