Box volume for a trench or pad: length times width times depth, then multiplied by 1 plus waste or swell percent. Output is ft³, yd³, and m³. Optional tons if you type density. Estimate only, not a cut-and-fill design.

Rated 4.7 out of 5 based on 356 reviews

Results

How to estimate excavation volume

  1. Enter length, width, and depth of the trench or pad. Each dimension must be greater than 0.
  2. Pick a unit for each edge. Depth can stay in feet while a pour page might keep depth in inches.
  3. Enter waste or swell from 0 to 50 percent. Swell is extra haul volume after the dirt leaves the hole.
  4. Optional: type density in lb/ft³ for tons. Confirm with a surveyor. This is not cut-and-fill design.

Excavation box volume

Trench or pad with optional swell, not a digital terrain model

In-place volumeL × W × D after converting each edge to feet
Waste / swellMultiply by 1 + percent / 100, 0 to 50%
Cubic yard27 cubic feet
Tonsft³ × density (lb/ft³) / 2000 when density is set
Default sketch20 ft by 3 ft by 4 ft trench
AdviceEstimate only. Not cut-and-fill design or code approval.

What this excavation page estimates

The hole is a rectangular box. That matches a straight trench or a simple pad, not a battered pit or a contour cut. Swell percent enlarges the hauled volume after soil loosens. Bank volume without swell is the same box at 0%. Pour volume for a slab is the concrete calculator, which can include bags. This page does not size shoring.

How trench volume is computed

Each edge converts to feet (inches / 12, yards × 3, meters / 0.3048, centimeters / 30.48). Volume ft³ = length × width × depth × (1 + waste/100). Cubic yards divide by 27. Cubic meters multiply ft³ by 0.028316846592. Optional tons = ft³ × density / 2000. Waste stays from 0 to 50.

Bank, swell, and related pours

Bank cubic yards are in-place dirt. Loose cubic yards after swell are what a truck sees. Shrink when compacting fill is a different percent you would apply as a negative only by lowering waste, which this form does not allow below 0. A DTM cut-and-fill from two surfaces needs survey software.

Use cases

A utility trench takeoff, a rectangular footing hole, or a homework box. Not a slope-stability check and not a permit.

Limits

Box geometry only. No benches, no batter, no water table. Not structural design or code approval. CZNull does not receive the sizes.

Excavation questions

Is swell the same as waste?
On this form both use the same percent field. The multiplier is 1 + percent / 100, capped at 50%.
Is this cut-and-fill design?
No. It is a rectangular estimate, not a terrain model or code approval.
How do I get tons?
Type a density in pounds per cubic foot. Tons = ft³ × density / 2000.
Where do I estimate the concrete that fills the hole?
Use the concrete calculator. This page is dirt volume, not mix.
Can depth stay in inches?
Yes. Pick inches on the depth unit. Length can stay in feet.
Does CZNull store the trench sizes?
No. The volume runs in this tab.